Getting the books journal biokimia karbohidrat now is not type Journal biokimia karbohidrat687C2E2DAE3DA7B6F7D62C121575E6DA Lampiran 1 Harga Penawaran Proyek C I Bill of Quantity Tanggal Deskripsi Qty Satuan Total !3-0kt-08 Main Materials UTP cable 4pair cat 5e 8 Roll MJ cat 5 e for outlet 27 Ea MJ cat 5e for patch panel 3 Ea PiP 24 port cat 5e 1 Unit PiP 24 port cat 5e unloaded type 1 Unit PIC 2m cat 5e at rack 27 Ea PIC 3m cat 5e for data at work 27 Ea 19"rack 15 RU wallmounting type included: 1 Unit heavy duty fan = 1 ea horisontal pow\:r distribution 6 outlet = 1 unit I cage nut = 20 ea Total M:Jin Materials 16.446.000 Supporting materials High impact PVC conduit 20 mm 300 Lgth Joint coupler 20 mm 600 Ea Flexible 20mm 2 Roll SadIe clamp 20 mm 200 Ea Out bow 27 Ea cable duct 50xl 00 1 Lgth small material 1 Lot Total Supporting Materials 4.341.000 Installation cost UTP cable installation included: 27 Nodes pulling, termination, scanning, labeling, testing Documentation 1 Delivery materiaL transportation, acomodation 1 Total Installation cost 2.610.000 TOTAL 23.397.000 VATlO% 2.339.700 Grand Total 25.736.700 Sumber : Internal Perusahaan
0 Comments
Leave a Reply. |